{"id":5575,"date":"2021-10-04T15:56:51","date_gmt":"2021-10-04T13:56:51","guid":{"rendered":"https:\/\/almarwater.com\/touring-the-shuqaiq-3-independent-water-project-with-luis-morales\/"},"modified":"2026-05-06T12:48:41","modified_gmt":"2026-05-06T10:48:41","slug":"touring-the-shuqaiq-3-independent-water-project-with-luis-morales","status":"publish","type":"post","link":"https:\/\/almarwater.com\/es\/touring-the-shuqaiq-3-independent-water-project-with-luis-morales\/","title":{"rendered":"Recorrido por la planta desalinizadora de Shuqaiq 3 con Luis Morales, Director T\u00e9cnico"},"content":{"rendered":"<h1 style=\"color: #246798; font-size: 30px;\">Touring the Shuqaiq 3 Independent Water Project with Luis Morales, TECHNICAL DIRECTOR<\/h1>\n<p style=\"text-align: center;\"><iframe loading=\"lazy\" title=\"Reproductor de video de YouTube\" src=\"https:\/\/www.youtube.com\/embed\/tsGNOIHmcwc\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\nAs part of our Showcase Series of interviews with the people involved in the US$ 600 million Shuqaiq 3 Independent Water Project (IWP), we return to the Saudi Arabian construction site to talk to Luis Morales, Technical Director at the plant.\n\nWith construction well underway, Luis discusses the complexities of the development in this new video, specifically the Reverse Osmosis (RO) process.\n\nHe offers viewers an exclusive insight into how one of the largest desalination plants in the world will soon be fully operational, using more than 7,000 reverse osmosis pressure vessels, equivalent to 54 kilometers, with more than 45,000 membranes working simultaneously to produce more than 18 million liters of pure water per hour.\n\nThat\u2019s 450,000 cubic meters per day, or around 180 olympic size swimming pools.\n\nLocated on the Red Sea coast of Saudi Arabia, Shuqaiq 3 is being developed by a consortium including <a href=\"https:\/\/www.alj.com\/en\/energy-and-environmental-services\/energy-overview\/\" target=\"_blank\" rel=\"noopener noreferrer\">Abdul Latif Jameel Energ\u00eda<\/a>\u2019s water solutions company, Almar Water Solutions, and <a href=\"https:\/\/alj-enterprises.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Abdul Latif Jameel Enterprises<\/a>; the project has already won awards as recognition of the importance of the project in the area.\n\nShuqaiq 3 will supply drinking water to over 1.8 million people over 25 years, as well as provide water for agriculture and industry, bringing us one step closer to providing clean safe drinking water to those facing water scarcity.","protected":false},"excerpt":{"rendered":"<p>As part of our Showcase Series of interviews with the people involved in the US$ 600 million Shuqaiq 3 Independent Water Project (IWP), we return to the Saudi Arabian construction site to talk to Luis Morales, Technical Director at the plant.<\/p>","protected":false},"author":3,"featured_media":5576,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"slim_seo":{"title":"Touring the Shuqaiq 3 IWP with Luis Morales, Technical Director - Almar","description":"As part of our Showcase Series of interviews with the people involved in the US$ 600 million Shuqaiq 3 Independent Water Project (IWP), we return to the Saudi A"},"footnotes":""},"categories":[37],"tags":[115,116,117,118,119,87],"class_list":["post-5575","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-37","tag-construction","tag-desalination-plant","tag-desalination-project","tag-reverse-osmosis","tag-saudi-arabia","tag-shuqaiq-3"],"_links":{"self":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/comments?post=5575"}],"version-history":[{"count":1,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5575\/revisions"}],"predecessor-version":[{"id":5579,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5575\/revisions\/5579"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/media\/5576"}],"wp:attachment":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/media?parent=5575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/categories?post=5575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/tags?post=5575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}