{"id":5239,"date":"2016-07-08T10:23:19","date_gmt":"2016-07-08T08:23:19","guid":{"rendered":"https:\/\/almarwater.com\/almar-water-solutions-pre-qualifies-for-a-desalination-plant-in-king-abdullah-economic-city-in-saudi-arabia\/"},"modified":"2026-05-06T13:21:22","modified_gmt":"2026-05-06T11:21:22","slug":"almar-water-solutions-pre-qualifies-for-a-desalination-plant-in-king-abdullah-economic-city-in-saudi-arabia","status":"publish","type":"post","link":"https:\/\/almarwater.com\/es\/almar-water-solutions-pre-qualifies-for-a-desalination-plant-in-king-abdullah-economic-city-in-saudi-arabia\/","title":{"rendered":"Almar Water Solutions precalifica para una planta desalinizadora en la Ciudad Econ\u00f3mica Rey Abdul\u00e1, en Arabia Saudita"},"content":{"rendered":"<h1 style=\"color: #246798; font-size: 30px;\">Almar Water Solutions precalifica para una planta desalinizadora en la Ciudad Econ\u00f3mica Rey Abdul\u00e1, en Arabia Saudita<\/h1>\n<p style=\"text-align: justify;\">Almar Water Solutions is pre-qualified for the development of a desalination project in King Abdullah Economic City, in Saudi Arabia. The desalination plant, with a capacity of 30,000 cubic metres\/day, expandable to 60,000 m\u00b3\/day, will supply a population of 150,000 people.<\/p>\n<p style=\"text-align: justify;\">The project scheme has not yet been defined \u2013 it could be an Engineering-Procurement-Construction (EPC) or Build-Operate-Transfer (BOT) project \u2013 but the customer has launched the Engineering-Procurement-Construction (EPC) tender process, bids for which must be submitted by the 30 October. In parallel, it is developing the documentation necessary for tendering the project as a Build-Operate-Transfer (BOT) scheme.<\/p>\n<p style=\"text-align: justify;\">With a surface area of 173 km\u00b2, the city is located on the Red Sea coast, around 100 kilometres to the north of Jeddah, the nerve centre of Saudi Arabia. It has a large industrial zone, a port, residential areas and a business centre. The city is forecast to develop over the coming years, and there is a real need for water for both human consumption and for the production processes of the industries located there.<\/p>\n<p style=\"text-align: justify;\">King Abdullah Economic City is a consolidated project that is expected to meet future water needs for sustainable growth in the region. Almar has been pre-qualified along with other companies, and is currently working on a bid.<\/p>","protected":false},"excerpt":{"rendered":"<p>Almar Water Solutions is pre-qualified for the development of a desalination project in King Abdullah Economic City, in Saudi Arabia. The desalination plant, with a capacity of 30,000 cubic metres\/day, expandable to 60,000 m\u00b3\/day, will supply a population of 150,000 people.<\/p>","protected":false},"author":3,"featured_media":5240,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"slim_seo":{"title":"Almar Water Solutions pre-qualifies for a desalination plant in King Abdullah Economic City, in Saudi Arabia - Almar","description":"Almar Water Solutions is pre-qualified for the development of a desalination project in King Abdullah Economic City, in Saudi Arabia. The desalination plant, wi"},"footnotes":""},"categories":[34],"tags":[],"class_list":["post-5239","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-34"],"_links":{"self":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/comments?post=5239"}],"version-history":[{"count":1,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5239\/revisions"}],"predecessor-version":[{"id":5241,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/posts\/5239\/revisions\/5241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/media\/5240"}],"wp:attachment":[{"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/media?parent=5239"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/categories?post=5239"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almarwater.com\/es\/wp-json\/wp\/v2\/tags?post=5239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}